Home   Locomotives   Rolling Stock   Gallery   Layout Tours   Details   Track Plan   Videos   The prototype   Links


Station - Postaja

Page one      Page two      Page three
Attention was then turned to the canopy. This was marked out to fit the building, then the under framing added from plastic strip.
The paving was scribed then glued to the base of the building and door steps added.
After making a simple jig, eight supports were soldered from brass. The circles were cut from brass tubing. The top strip is channel section to locate on the framing.



Rainwater guttering was made from half-round
brass.

After cutting to length, each piece was
taped down onto a board marked at even intervals and thin soft brass wire was pressed over and soldered to simulate support brackets.

Down pipes were made from brass rod, bent to
shape and soldered below the gutters.
Brackets to hold them to the walls were also
made from thin brass wire.


Page one      Page two      Page three