Home   Locomotives   Rolling Stock   Gallery   Layout Tours   Details   Track Plan   Videos   The prototype   Links


Log unloading at Cargo Warehouse



Above is the model as purchased, and with the tops removed. Below left shows the removed cab roof deflector
and below right the platforms have had the sides removed and the crane installed.



Above are the bulkheads before and after fitting to the decks.
Below shows the side stakes fitted and later after painting and testing with logs and crane.




Above off-loading logs directly into wagons and below stacking onto the ground





Now the surface of the loading ramp will be completed with grass and weeds etc. and trees behind.