5th February 2012
|
As the turntable on the previous layout was built into the framing, a new one
is needed. So this Peco kit was acquired.
It looks to be very good quality with detailed assembly instructions, a full-size
template to cut the hole to receive the well and an example of how it can
be motorised.
I will assemble the kit in readiness for the time it can be installed on the new
layout.
Click the thumbnail for more images.
|
26th January 2012
New MRCE dispolok diesel acquired to run stone trains and general freight

16th January 2012
Some of the stock awaiting a new layout.
14th January 2012
Preliminary trackplan sketch (not to scale). This will certainly change, but gives a rough idea of what is desired.
12th January 2012
After measuring up the area where the layout will be, the baseboards should be around 4m x 1.5m, for the main running circuit, station, etc. plus an extension 2m x 0.75m for the stone loader plant.
|